Growers United

|

‘s-Gravenzande

2 MWh Energy Storage System

Currently, work is being done to realize an energy storage system at this location. The battery installation is used to utilize self-generated energy more efficiently and limit peak loads. After completion, the system offers additional flexibility in energy consumption and represents an important step towards future-proof energy management. Once the installation has been put into operation, additional information about this project will follow.

Curious about the possibilities for your company? Feel free to contact us!

2 MWh

Total capacity (100% DoD)

1 MW

Total installed power

Own consumption

Use of EOS

Applied techniques

Similar projects

  • Koolhaas Naturally

    |

    Bleiswijk

    4.5 MWh Energy Storage System

  • Van Tuijl Feed Enrichment

    |

    Kesteren

    5.3 MWh Energy Storage System

  • Gerbera United

    |

    Moerkapelle

    2.15 MWh Energy Storage System