Growers United

|

‘s-Gravenzande

2 MWh Energy Storage System

Work is currently underway on the realization of an energy storage system at this location. The battery installation is being deployed to utilize self-generated energy more intelligently and to limit peak loads. Upon completion, the system will offer additional flexibility in energy usage and represent a significant step toward future-proof energy management. Additional information about this project will follow once the installation has been commissioned.

Interested in the possibilities for your company? Please feel free to contact us.

2 MWh

Total capacity (100% DoD)

1 MW

Total installed power

Self-consumption

Use of ESS

Applied technologies

Similar projects

  • Koolhaas Natuurlijk

    |

    Bleiswijk

    4.5 MWh Energy Storage System

  • Van Tuijl Feed Enrichment

    |

    Kesteren

    5.3 MWh Energy Storage System

  • Gerbera United

    |

    Moerkapelle

    2.15 MWh Energy Storage System