Cooperatie Kompany U.A.
|
Venlo
1.5 MWh Energy Storage System
Work is currently underway on the realization of an energy storage system at this location. The battery installation will be used to utilize energy more efficiently, limit peak loads, and contribute to the stability of the electricity grid. Upon completion, the system will offer additional flexibility in energy usage and represent a significant step toward future-proof energy management. Additional information regarding this project will follow once the installation has been commissioned.
Interested in the possibilities for your company? Please feel free to contact us.
1.5 MWh
Total capacity (100% DoD)
756 kW
Total installed power
Self-consumption & grid balancing
ESS usage