CHARGING ON YOUR OWN PREMISES

Charging infrastructure for businesses

Charge your fleet using your own power, on your own premises, and within your existing connection. From the first two charging points to a charging hub for your entire fleet.

The right charging solution for every business

A transporter with twenty trucks requires something different than a grower with their own transport or a company starting with two charging points. The right solution depends on your current and future vehicles, their idle hours, and the grid capacity at your location.

Transport and logistics

A charging hub for trucks and box trucks at your own depot, for charging overnight or between shifts.

Charging hubs for transport

Horticulture and agriculture

Charging on your own solar power, managed by the same EMS as your solar panels and battery.

Energy for horticulture

Industry, distribution, and SMEs

From two charging points at your premises to a charging hub for your entire fleet.

Energy for industry

Bata battery storage with open cabinets

GRID CONNECTION

Charging despite grid congestion

Waiting for a heavier connection can easily take years. With a battery and a flexible contract, you relieve the grid during peak hours, which is why the grid operator gives you priority.

WITHOUT BATTERY

3 to 7

years waiting for grid capacity

WITH BATTERY

18 to 30

months until grid connection

Energiesysteem van een laadplein: zonnepanelen, batterij, trafostation, laadpunten en het bedrijf, verbonden met kabels waarover de stroom loopt

Overdag

De zonnepanelen leveren meer dan het bedrijf verbruikt. Het overschot gaat naar de batterij of direct naar de trucks.

THE SYSTEM

Five components, one system

The most difficult part of charging is not the charging station, but everything behind it. A charging hub is an energy system with plugs attached, and Bata designs it as a single entity.

01

Grid connection and medium voltage

Substation, transformer, and switchgear, including the application to the grid operator.

02

Battery storage

Stores daytime generation for the night and absorbs peaks, from 1 MWh to systems of 40 MWh.

03

Solar panels

The cheapest kWh available, without transport costs and energy tax.

04

Energy management

The EMS manages based on departure time instead of arrival and strictly limits to the contracted capacity.

05

Charging points

The final piece, controlled from the power cabinet and the EMS. Technically the simplest step, if the other four are correct.

Which charging point you need

IF YOUR FLEET IS NOT GROWING

Standalone

Power cabinet and charging pedestal in one housing, with a fixed capacity for one charging point. Simple and independent.

IF YOUR FLEET IS GROWING

Distributed

One power cabinet distributes power across multiple charging points as needed. Expansion simply means adding more charging points.

Two charging pedestals along the facade of Royal Berry in Huissen

Half the cost of public charging

At your own charging hub, you pay the price of your energy contract and your own solar power, not the rate of a public charger. The more you charge, the greater the difference.

Private charging hub

€0.23

per kWh or less

€0.175 to €0.23, depending on your energy contract and own solar panels.

Public charging

€0.50

per kWh on average

Public truck chargers charge between €0.35 and €0.80 per kWh.

Per truck per year

€36,000

benefit at 120,000 kWh

Based solely on the difference in kWh price.

Charging hub with charging stations and battery storage

SUBSIDIES

Stacking is allowed

You can stack subsidies for the charger and the battery, tax deductions for the whole system, and a return per charged kWh. Bata handles the applications as part of the project.

SPRILA for the charger

up to €88,000 per charging point

SPRILA for the battery

€85 per kWh

EIA for the investment

40% extra deduction

AanZET for the truck

up to €115,200 per truck

ERE

Every kWh generates EREs

Fossil fuel suppliers must reduce the COâ‚‚ emissions of their energy. If they fail, they buy emission reduction units (EREs) from those who do save COâ‚‚, such as a charging hub, even if it is behind a fence. Bata handles measurement, registration, and administration.

ON GRID POWER

+ €0.10

per charged kWh

ON OWN SOLAR POWER

+ €0.20

per charged kWh

Truck between bulb fields
Brochure DC charging hub for electric trucks from Bata Energy Solutions

BROCHURE

The charging hub in one brochure

Everything you want to know before building a charging hub: the market, the grid connection, the system, and projects already in operation.

You will receive the brochure in your inbox immediately.

HOW WE WORK

Five phases, one point of contact

As an EPC partner, Bata handles the design (engineering), procurement, and construction itself, followed by management. No middleman to point fingers if something doesn’t work.

Phase 01

The application

We discuss the location, fleet, and connection, and perform an immediate grid check.

01

Phase 02

The energy profile

We translate route patterns and charging windows into power and energy per day.

02

Phase 03

Design

We design charging points, battery, solar, and EMS, including grid design and business case.

03

Phase 04

Subsidy and permit

We handle the grid application, subsidies, environmental permit, and fire safety requirements.

04

Phase 05

Realization

We build, arrange the connection, and commission the hub after inspection.

05

After completion

Management

We monitor the hub via the EMS, provide maintenance under an SLA, and handle ERE administration.

+

COMPLETED ENERGY SOLUTIONS

Our charging projects

Frequently asked questions

The questions entrepreneurs ask us most often about their own charging solution. If your question is not listed, please contact Bart Maandag.

If your existing business premises has more than 20 parking spaces, there must be at least 1 charging point. From January 1, 2027, this will be 1 charging point per 10 parking spaces, or cable ducts for at least half of the spaces. For new construction or major renovations with more than 5 parking spaces, 1 charging point per 5 spaces applies. A mandatory charging point must be suitable for smart charging. This is stated by the RVO, according to the European EPBD IV directive.

Charging on your own premises, at night or between shifts, at times when your vehicles are idle anyway. You are not dependent on public charging points and maintain control over your planning.

That depends on the number of charging points, the power, the grid connection, and whether a battery and solar panels are included. Bata always first creates a customized business case, including the subsidies that apply to you. The charging scan is the first step.

Yes. Bata often builds charging hubs as a follow-up to solar and storage. The EMS then manages generation, storage, and charging together, so that the peak on the grid remains flat.

This is determined by the energy required per night and your charging window. We calculate 1.2 kWh per kilometer for a tractor-trailer and approximately 1 kWh for a box truck. Ten trucks driving 300 kilometers together require 3,000 kWh per night. In a ten-hour window, that averages 300 kW.

Trucks currently charge via CCS2, practically up to 350 to 400 kW per charging point. Megawatt charging (MCS, up to 1.5 MW) is coming, but the standard has not yet been finalized. Bata installs the cable route and foundation so that MCS can be added later without re-excavating.

If the charging hub fits within your existing connection, it is a matter of months. At Van Aalsburg in Hellouw, there were six months between the site visit and completion.

A permit is often required for a battery and a transformer. Bata handles the environmental permit and fire safety requirements.

We involve your insurer and the safety region as early as the design phase. In practice, they set stricter requirements than the competent authority, and we design accordingly.

The charging hub, because the grid connection has the longest lead time. Coordinate the ordering of the vehicles with the planning of the hub.

PERSONAL ADVICE

Your charging hub calculated

No quotation process taking weeks. With five pieces of data about your location and your fleet, Bart creates a system design, a cost price per kilometer, and a subsidy route.

The charging scan, five fields

1

Where the charging hub will be located

2

Number of trucks now and in the future

3

Mileage per truck per year

4

When the trucks are idle

5

Capacity of the current connection

Bart Maandag

Business Developer Charging Hubs

Bart Maandag, Business Developer Charging Hubs bij Bata Energy Solutions