SMART CHARGING OF TRANSPORT VEHICLES ON-SITE

Charging hubs for transport, even where the grid is at capacity

Bata designs, builds, and manages charging hubs for electric trucks. With smart charging and battery storage, you can extract more power from your existing grid connection.

Electric driving has become a calculation

The additional cost of an electric truck is earned back through mileage. Two factors make the difference, and together they add up. The more kilometers you drive, the faster the truck pays for itself.

The price per kilowatt-hour

€36,000

benefit per truck per year, at 120,000 kWh

Public charging costs approximately €0.50 per kWh; a private charging hub costs €0.175 to €0.23.

The levy

€16,300

benefit per truck per year, at 100,000 km

A Euro VI truck pays 20.1 cents in truck levy per kilometer, while a zero-emission truck pays 3.8 cents.

The total

50 to 60%

cheaper per kilometer than diesel

At a private charging hub, energy costs approximately €0.23 per kilometer, compared to €0.46 for diesel.

Charging hub with charging stations and battery storage

SUBSIDIES

Stacking is permitted

You can stack subsidies for the charger and the battery, tax deductions for the whole system, and a return per charged kWh. Bata handles the applications as part of the project.

SPRILA for the charger

up to €88,000 per charging point

SPRILA for the battery

€85 per kWh

EIA for the investment

40% extra deduction

AanZET for the truck

up to €115,200 per truck

ERE

Every kWh generates EREs

Fossil fuel suppliers must reduce the COâ‚‚ emissions of their energy. If they fail, they purchase emission reduction units (EREs) from those who do save COâ‚‚, such as a charging hub, even if it is behind a private fence. Bata manages the measurement, registration, and administration.

ON GRID POWER

+ €0.10

per charged kWh

ON OWN SOLAR POWER

+ €0.20

per charged kWh

Truck between bulb fields
Bata battery storage with open cabinets

GRID CONNECTION

Your connection is not your ceiling

Waiting for a heavier connection can easily take years. With a battery and a flexible contract, you relieve the grid during peak hours, which is why the grid operator gives you priority.

WITHOUT BATTERY

3 to 7

years waiting for grid capacity

WITH BATTERY

18 to 30

months until grid connection

Diagram of a charging hub with grid, solar panels, battery, charging stations, and truck

THE CHARGING HUB

Four components, one system

A charging hub that runs solely on grid power is more expensive and vulnerable than necessary. Bata designs solar, battery, control systems, and chargers as a single integrated unit.

01

Solar panels

During the day, the surplus goes to the battery or directly to the trucks.

02

Battery storage

The battery stores daytime generation for the night and absorbs the peak.

03

Energy management

The EMS manages based on departure times and strictly limits power to the contract capacity.

04

Charging points

A central power cabinet distributes power to the points requesting electricity.

TRANSPORT

Why choose
Bata Energy Solutions

The benefits

Single point of contact

Grid application, design, construction, monitoring, and maintenance by one team.

One system

Battery, solar panels, chargers, and controls designed as a whole, and expandable as your fleet grows.

The upfront calculation

Costs per kilometer, subsidies, and ERE revenue for your own fleet, before you invest.

Demonstrably green charging

Your own solar power counts 100 percent toward ERE registration and doubles the revenue per kWh.

COMPLETED ENERGY SOLUTIONS

Charging hubs for heavy transport

Electric truck from H.Z. Logistics at the charging station at Royal Berry in Huissen

HUISSEN

Royal Berry Customer Story

At Royal Berry in Huissen, Bata integrates solar panels on the steel roof, 5 MWh of battery storage, and two power units feeding four DC charging points for heavy transport. Because generation, storage, and charging are managed together, the grid peak remains flat, providing room to grow without requesting additional transport capacity.

Read more

HOW WE WORK

Five phases, one point of contact

The most difficult part of a charging depot is not the charging station, but everything behind it. Bata handles it all, with single-source responsibility.

Phase 01

The application

We discuss the location, fleet, and connection, and perform an immediate grid check.

01

Phase 02

The energy profile

We translate route patterns and charging windows into power and energy requirements per day.

02

Phase 03

Design

We design the charging points, battery, solar, and EMS, including grid design and the business case.

03

Phase 04

Subsidies and permits

We handle the grid application, subsidies, environmental permits, and fire safety.

04

Phase 05

Realization

We build, coordinate the connection, and commission the hub after inspection.

05

After completion

Management

We monitor the hub via the EMS, provide maintenance under an SLA, and handle ERE administration.

+

Brochure DC charging hub for electric trucks from Bata Energy Solutions

BROCHURE

The charging hub in one brochure

Everything you need to know before building a charging hub: the market, the grid connection, the system, and projects already in operation.

You will receive the brochure in your inbox immediately.

Frequently Asked Questions

The questions transport entrepreneurs and their advisors ask us most often, in the order they arise during decision-making. If your question is not listed, please contact Bart Maandag.

That depends on the type of truck and the year of first registration. A Euro VI rigid truck from 2017 through 2019 may enter a zero-emission zone until January 1, 2028. A Euro VI rigid truck from 2020 through 2024 and a Euro VI tractor unit may do so until January 1, 2030. Any truck purchased new after January 1, 2025, can only enter the zone emission-free. Start planning now, as a charging hub in a congestion area requires 18 to 30 months.

Increasingly so. Municipalities and other tenderers set zero-emission as a condition, especially for urban transport. Those who cannot provide it will not be able to participate in those contracts. A private charging hub makes emission-free driving affordable because you are not dependent on public charging rates.

Then you start within the connection you already have. Smart charging based on departure times reduces the requirement for twenty trucks from 3,000 kW to approximately 820 kW, and there is often 30 to 50 percent unused space in the existing contract. A battery levels out the rest of the peak. This turns your location into a congestion mitigator, which receives priority from the grid operator. Additionally, there are alternative transport rights with 17 to 50 percent discounts and energy hubs with neighboring companies.

This is determined by the energy required per night and your charging window. We calculate 1.2 kWh per kilometer for a tractor-trailer and approximately 1 kWh for a rigid truck. Ten trucks driving 300 kilometers require a total of 3,000 kWh per night. In a ten-hour window, that averages 300 kW. Therefore, 50 to 150 kW per charging point is sufficient at a depot. Higher power levels are primarily needed for topping up between trips.

That depends on the grid situation. If the hub fits within your existing connection, it is a matter of months. At Van Aalsburg in Hellouw, there were six months between the site visit and completion. If additional grid capacity is required, you may wait three to seven years in a congestion area. With a battery and a flexible grid contract, that is reduced to 18 to 30 months.

A standalone charger has the power cabinet and dispenser in a single housing and provides its power to one charging point. A distributed system has a central power cabinet that distributes power to the points requesting electricity at that moment. This utilizes the connection better and makes expansion simple. If you expect your fleet to grow, distributed is the logical choice.

Trucks currently charge via CCS2, practically up to 350 to 400 kW. Megawatt charging (MCS, up to 1.5 MW) is coming, but the standard has not yet been finalized. Bata therefore builds CCS and installs cable routing and foundations so that MCS can be added later without re-excavating. With a distributed system, you then only replace the dispenser, not the power electronics.

All installations are monitored remotely via the EMS, so deviations are visible before they lead to failure. Bata Basic includes telephone availability on workdays, a 24/7 emergency number, annual inspection and preventive maintenance, remote monitoring, and proactive alerts. Bata Beter adds an on-site technician within four hours and spare parts kept in stock.

We take that into account in the design. A distributed system can be expanded with extra dispensers, and the battery with extra modules. We install cable routes with spare capacity, so expanding is a matter of adding components rather than digging again.

We involve your insurer and the safety region as early as the design phase. In practice, they set stricter requirements than the competent authorities, and we design to meet those standards.

The charging hub, because the grid connection has the longest lead time. Start the hub process as soon as you know how many trucks will be added in the coming years, and coordinate the truck order with the hub’s schedule.

PERSONAL ADVICE

Your charging hub calculated

No quotation process taking weeks. With five pieces of data about your location and your fleet, Bart creates a system design, a cost price per kilometer, and a subsidy route.

The charging scan, five fields

1

Where the charging hub will be located

2

Number of trucks now and in the future

3

Mileage per truck per year

4

When the trucks are idle

5

Capacity of the current connection

Bart Maandag

Business Developer Charging Hubs

Bart Maandag, Business Developer Charging Hubs bij Bata Energy Solutions